© Copyright 2026. Designed and Developed by Republica.
Smart home project: Residential development with 90 apartments and 6 shops, which integrates video intercom in each of the 90 apartments in a single ecosystem with touch keyboard, and video surveillance system.
Vista A Mirear – Miraflores, Oeiras
Solyd development, 90 apartments + 6 shops
2026 – 2027
Client
Solyd
Oeiras
Global smart home project, which includes, Home Automation: Video intercom, ON/OFF lighting, blinds/blackouts, air conditioning (HVAC and electric underfloor heating), WC fans, hot water recirculation, pool cover, garage doors, intrusion alarm, monitoring of energy consumption and production, humidity management, air quality and temperature.
Astronomical Clock to automate lights, blinds and air conditioning depending on sunrise and sunset.
Google Home and Amazon Alexa voice commands.
Wi-Fi coverage throughout the house.
Villas in Praia da Luz
2 Villas | Lagos | Architect Mário Martins
2026 – 2027
Client
Lagos
Smart home project in a riverfront condominium (Reformosa), next to Parque das Nações integrated in the historic Tabaqueira building, in the area adjacent to Selva. It combines the rehabilitation of the industrial heritage with new residential towers, with an access control solution with IP video intercom and centrally managed access control for people and vehicles, Indoor View in each of the 89 apartments, with Bluetooth, RFID and NFC.
Legacy Oriente – Braço de Prata
89 Apartments in historic Tabaqueira building
2026 – 2027
Client
Lisboa
Global smart home project, which includes, Home automation: Video intercom, ON/OFF lighting, Electric blinds/blackouts and curtains, Air conditioning (HVAC and electric underfloor heating), WC fans, Mirror defroster, Electric towel rails, Humidity, air quality and temperature management, Hot water recirculation, ON/OFF AQS System, Garage doors, Intrusion, fire and flood alarm, Pool cover, Irrigation management with rainfall measurement, Astronomical clock to automate lights, blinds and air conditioning depending on sunrise and sunset, Google Home and Amazon Alexa voice commands.
Cascais 25
5 Apartments | Cascais | Architect Marco Marinho
2026 – 2027
Client
Cascais
Smart home project: Residential development with 165 apartments T1 to T5 in 5 blocks, with private garden, outdoor pool, gym and multipurpose room, which integrates video intercom, indoor video and access control in a single ecosystem at the main entrances, in each apartment, with Bluetooth, RFID and NFC.
Luz Altear – Alta de Lisboa, Lumiar
165 T1 to T5 by SOLYD
2026 – 2027
Client
Solyd
Lisboa
Sinalcabo proceeded with the Connection to the Network and Installation of more than 300 dual 22KW chargers in the Municipalities of Lisbon, Montijo, Moita, Beja, Oliveira de Frades and São João da Madeira.
Chargers of Electric Vehicles
WOWPLUG
2026
Client
WOWPLUG
Municipalities of Lisbon, Montijo, Moita, Beja, Oliveira de Frades and São João da Madeira.
Sinalcabo carried out the Installation of Chargers of Electric Vehicles at NOS’s Facilities in Norte Shopping, Campo Grande and Parque das Nações.
Chargers of Electric Vehicles
NOS Communications
2026
Client
BRIGHTCITY
Porto – Norte Shopping
Lisboa – Parque das Nações
Lisboa – Campo Grande
Sinalcabo was responsible for the Design, Design and Installation of the TAJBOM Charging Hub consisting of a 630KVA Transformer Station and 5 150KW Fast Chargers.
Energia Elétrica para Postos de Carregamento de Veículos Elétricos
Posto de Transformação HUB TAJBOM
2026
Client
INSTAVOLT
Palmela
Installation carried out on a roof, with a total of 538 panels of 545 Wp totaling a power of 293.21 Kwp and 240Kwn.
UPAC Rooftop – 538 Panels
Congress Center
2026
Client
Greenvolt
Lisboa
UPAC Parking Falésia Mar ABF.
Installation carried out on the ground, with CarPark structure, with a total of 1114 590Wp Panels totaling one power of 657.26 Kwp and 350Kwn with 700Kwh in batteries.
This power plant is designed for the hotel industry in a way to ensure its independence from the distribution system.
UPAC 1.114 Solar Panels
Car Park
2026
Client
Blue Sun – Hot e Tur, Lda
Albufeira
Installation carried out on a roof, with a total of ~120 580Wp Panels totaling a power of 69.6 Kwp and 50Kwn with 100Kwh in batteries.
This power plant is designed for the film industry in order to ensure its independence from the distribution network.
UPAC com 120 Painéis
Indústria Cinematográfica
2026
Client
Nirvana Studios
Oeiras
UPAC – Mercedes Santarém
Installation carried out on the ground, with a customized ballasted structure, with a total of 220 panels of 545Wp totaling a power of 120Kwp and 100Kwn.
UPAC on Ground – 220
Mercedes Santarém Panels – Marques Lda
2026
Client
HCI
Santarém
Sinalcabo is carrying out the Construction of an Underground High Voltage Line between the Carriche Substation and the Quinta da Caldeira Substation with cables of 3 x LXHIOLE 1x1000m2 – 60KV. The Work was awarded by E-Redes to Sinalcabo to interconnect two High Voltage Substations whose route crosses the municipalities of Loures and Odivelas, also having a PHD (Directed Horizontal Drilling) under CRIL and Ribeira da Póvoa.
60kV SE High Voltage Underground Line
Quinta da Caldeira – SE Carriche
2025
Client
E-REDES
Carriche
Sinalcabo carried out the Electrical Infrastructures for the Requalification of the Tavira Riverfront, consisting of lighting shafts equipped with speakers and Wi-Fi internet access equipment, also providing the public garden with electrical panels for holding events.
Electrical Infrastructures
Riverfront Requalification
2025
Client
ATIV
Tavira – Rua do Cais
Sinalcabo carried out the LED barrier lighting on the new Bridge over the Gilão + River in Tavira, a project authored by Eng. Júlio Appleton from A2P Consult – Estudos e Projetos, Lda
Street Lighting
New Bridge over Gilão River
2025
Client
Tecnovia
Tavira
Sinalcabo has built the Public Service Infrastructures to the New Atlas Edge Data Center in Carnaxide with Medium Voltage connections to the Miraflores Substation and Zambujal substation with 3x cable LXHIOZ1 1 x 500m2.
Power Infrastructures, with medium voltage connections
Data Center
2025
Client
ATLAS EDGE
Carnaxide
Implementation of an integrated access control system for the entrance of the Ro-Ro terminal, with connection to the CUP single port card. The core objective of the Access Control of People and Vehicles was to be an integrated solution in automatic authentication at the entrances and exits to the terminal, with electromechanical barriers, turnstiles with RFID and Biometrics validation, context video surveillance, automatic license plate reading (LPR), and authentication of heavy drivers and passengers.
Access Control People and Vehicle
APSS Setúbal
2023
Client
APS Setúbal
Terminal Ro-Ro
This project is based on an integrated and state-of-the-art technological solution, including the implementation and operationalization of advanced systems for access control of people and vehicles, container reading, electronic meeting points, as well as windlasses and turnstiles, automatic barriers, traffic lights, automatic gates and computer equipment, also ensuring full integration with the JUL (Single Port Window) system. The intervention also includes the execution of electrical and communications infrastructures, the installation of metal roofs at the entrances, the execution of the necessary civil works, as well as the development of plans and architecture, training actions and maintenance services, ensuring the sustainability and reliability of the solution in the long term.
TGLS Intervention Areas
TGLS; TMS; TCS; Logistics Activities Zone (ZAL); Recreational and Shelter Ports; Corneanas: East Zone (Entrance and TGN Pier); Buildings; Technical Campus; Port of Portimão
Modernization of Access Control
APS Port of Sines and Portimão
2026
Client
APS Sines and Portimão
Terminal Granéis Líquidos
Terminal Multipurpose
Outras zonas
The technological genesis of the project considers the implementation and operationalization of electronic access control (people and vehicles) and security systems, which include: digital information panels and self-service kiosks, context video surveillance, automatic gates with traffic lights, magnetic detection of the presence of vehicles, turnstiles for managing the access of people, authentication of vehicles – heavy and light – with license plate reading, authentication of people with biometrics, rfid, citizen card, computer equipment, and automatic fire detection systems: at the entrances of the North Terminal (TN), Solid Bulk Terminal (TGS) and Liquid Bulk Terminal (TGL), as well as the digitalization of existing processes, and new ones to be introduced, in accordance with the technical-functional integration with the Single Logistics Window (JUL) platform. The project also includes all civil construction works, such as, among others: replacement of the current entrances with new ones, surrounding infrastructures, access and circulation roads, fencing, and automatic gates.
Digital Terminals
APA Port of Aveiro
2025 – 2026
Client
APA Port of Aveiro
Terminal Norte
Terminal Granéis Líquidos
Terminal Granéis Sólidos
This project is based on an integrated urban revitalization solution through technological modernization, combating the desertification of the urban center and adapting it to new modes of consumption. The implementation includes digital platforms (website, mobile application and marketplace integrated with SIBS payments), Digital Information Centers with interactive billboards and Ledwalls, Smart Benches with sustainable charging, monitoring systems with video analytics in Deep Learning and a new urban generation Wi-Fi network. The project includes the development of platforms and dashboards, equipment installation, technical training of users and technical support for 3 years.
Main Components:
Digital Presence (Website, App, Marketplace); Physical Infrastructure (Billboards and Smart Benches); Monitoring and Data; New generation connectivity.
Digital Commercial Districts
C.M. de Moimenta da Beira
2025 – 2026
Client
C.M. de Moimenta da Beira
Urban Revitalization
Digital Commerce
Public Connectivity
This project is based on an integrated solution for re-equipping and strengthening the technological infrastructure, modernizing the professional training offer through the digital transition. The implementation includes high-speed fiber optic network infrastructure with new generation WIFI, dedicated datacenter with server clusters, learning environments equipped with 4K interactive panels, photography and video studios, Virtual Reality (VR) kits and 3D printing units (FDM) for prototyping. The project also includes high-performance workstations, mobile laboratories and support technologies for students with Special Educational Needs, with technical support for 3 years.
Areas of Intervention
CTE Informatics; CTE Digital (Lots 3 and 4); CTE Industrial; Datacenter; Production Studios; Innovation Labs
Modernization of Specialized Technological Centers
Cidadela School Group
2025
Client
Cidadela School Group
CTE Informática
CTE Digital
CTE Indústrial
Sinalcabo carried out all the Electrical Installations of the Tagus Trancão Park, including the Stage of the Journeys and support for the Closing Ceremony of WYD 2023 in Lisbon.
Electrical Installations of the Tagus Park Trancão
Network
2023
Client
SRU Lisboa Ocidental
Lisboa